Water Infrastructure Development Projects
New Bahr Moais Head Regulator Project
A water infrastructure project aimed at improving water control, facilitating water distribution balancing, and enhancing the management of water flows through the construction of a new head regulator on Bahr Moais in Qalyubia Governorate.

Project Overview
The project is located approximately 1.50 km from Kafr Moais, in Banha, Qalyubia Governorate. The new regulator is situated at the head of Bahr Moais, which branches off the Tawfiqi Rayah at km 35.00 on the right bank, approximately 580 metres downstream of the existing head regulator.
The new regulator was planned in response to the age and deteriorating structural condition of the existing regulator, originally constructed in 1888. The existing structure plays an important role in supplying freshwater to Sharqia Governorate and parts of the Canal Governorates, including Ismailia and Port Said.
The project aims to facilitate water distribution balancing, improve control over water flows, and maximise the efficient use of available water resources.
Main Objective
Improve water flow control, facilitate water distribution balancing, and maximise the efficient use of water resources.
Structural and Hydraulic Specifications
Number of Bays
5 bays, each 5 metres wide.
Bridge Load Capacity
70 tonnes; the bridge roadway is 12 metres wide, including two sidewalks.
Maximum Balancing Difference
2.50 metres.
Maximum Design Flow
13.750 million cubic metres per day.
Maximum Water Level
12.45 metres.
Project Duration
24 months, according to the published project information.
Components of the New Regulator
The project specifications include a concrete bridge designed for a load capacity of 70 tonnes, five bays equipped with vertical gates, and operating and control systems that support the management of water flows.
Associated facilities include two water-level measurement wells, a generator building, a control building, a monitoring building, perimeter fencing and metal gates, lighting and fire protection systems, a standby power generator, and control and monitoring equipment.
Integrated Operation and Control System
Metal gates, operating mechanisms, control and monitoring systems, and supporting electrical equipment.
Protection and Rehabilitation Works
Bed and side-slope protection, watercourse rehabilitation, and repair and restoration works on parts of the existing regulator, as specified in the project scope.
Project Scope of Works
Integrated civil, hydraulic, mechanical, and electrical works
Watercourse and Diversion Works
The works include dredging and widening the watercourse, stone pitching of side slopes, raising adjacent embankment levels, bed protection, constructing the diversion channel, installing sheet piles, and carrying out excavation and diversion activities.
Regulator Structure Construction
These works include temporary earth cofferdams, dewatering, soil replacement, concrete works, bridge construction, installation of metal gates, and construction of auxiliary facilities and operating systems.
Mechanical and Electrical Works
Supply and installation of gate operating and lifting systems, lighting, fire protection and civil defence systems, a standby generator, and control and monitoring equipment.
Rehabilitation of the Existing Regulator
The published works include repairing and restoring stone masonry, installing steel sections, maintaining and painting gates and operating equipment, and rebuilding the rear parapet of the existing regulator.
Project Implementation Entities
Executing Entity
Armed Forces Engineering Authority – Military Engineers Department.
Consultant
Engineering Consulting Bureau
(ECB).
Contractor
The Arab Contractors – Tunnels and Sliding Formwork Department.