{"id":36628,"date":"2026-10-14T10:06:03","date_gmt":"2026-10-14T08:06:03","guid":{"rendered":"https:\/\/www.mwri.gov.eg\/mwri2\/?post_type=portfolio&#038;p=36628"},"modified":"2026-10-14T10:26:41","modified_gmt":"2026-10-14T08:26:41","slug":"new-bahr-moais-head-regulator-project","status":"publish","type":"portfolio","link":"https:\/\/www.mwri.gov.eg\/mwri2\/?portfolio=new-bahr-moais-head-regulator-project&lang=en","title":{"rendered":"New Bahr Moais Head Regulator Project"},"content":{"rendered":"<div class=\"wpb-content-wrapper\" id=\"wpb-content-root\"><p>[vc_row gap=&#8221;0px&#8221; rtl_reverse=&#8221;yes&#8221; css=&#8221;.mwri_bahr_moais_hero{background:#173f67 !important;}&#8221;][vc_column width=&#8221;1\/2&#8243; css=&#8221;.mwri_bahr_moais_hero_text{padding:65px 45px 65px 25px !important;}&#8221;]<div id=\"cz7459\" class=\"cz7459 cz_title clr cz_title_pos_inline\"><div class=\"cz_title_content\"><div class=\"cz_wpe_content\"><p style=\"text-align:left;margin-bottom:12px;\"><span style=\"color:#CBA123;font-size:16px;font-weight:bold;\">Water Infrastructure Development Projects<\/span><\/p>\n<h1 style=\"text-align:left;margin:0 0 20px;\"><span style=\"color:#ffffff;font-size:38px;line-height:1.7;font-weight:bold;\">New Bahr Moais Head Regulator Project<\/span><\/h1>\n<hr style=\"width:80px;margin-left:0;border:0;border-top:3px solid #CBA123;\" \/>\n<p style=\"text-align:left;color:#ffffff;font-size:17px;line-height:2.3;\">A water infrastructure project aimed at improving water control, facilitating water distribution balancing, and enhancing the management of water flows through the construction of a new head regulator on Bahr Moais in Qalyubia Governorate.<\/p>\n<\/div><\/div><\/div>[\/vc_column][vc_column width=&#8221;1\/2&#8243; css=&#8221;.mwri_bahr_moais_hero_image{padding:0 !important;}&#8221;]<div id=\"cz2595\" class=\"cz2595 cz_title clr cz_title_pos_inline\"><div class=\"cz_title_content\"><div class=\"cz_wpe_content\"><p><img decoding=\"async\" src=\"https:\/\/www.mwri.gov.eg\/wp-content\/uploads\/2026\/09\/2-1.png\" alt=\"New Bahr Moais Head Regulator Project\" style=\"display:block;width:100%;height:100%;min-height:350px;object-fit:cover;\" \/><\/p>\n<\/div><\/div><\/div>[\/vc_column][\/vc_row][vc_row gap=&#8221;0px&#8221; rtl_reverse=&#8221;yes&#8221; css=&#8221;.mwri_bahr_moais_intro{padding:65px 0 !important;background:#ffffff !important;}&#8221;][vc_column width=&#8221;2\/3&#8243; css=&#8221;.mwri_bahr_moais_intro_text{padding:15px 35px !important;}&#8221;]<div id=\"cz8823\" class=\"cz8823 cz_title clr cz_title_pos_inline\"><div class=\"cz_title_content\"><div class=\"cz_wpe_content\"><h2 style=\"text-align:left;color:#173F67;font-size:30px;font-weight:bold;\">Project Overview<\/h2>\n<hr style=\"width:75px;margin-left:0;border:0;border-top:2px solid #CBA123;\" \/>\n<p style=\"text-align:left;color:#555;font-size:16px;line-height:2.4;\">The project is located approximately 1.50 km from Kafr Moais, in Banha, Qalyubia Governorate. The new regulator is situated at the head of Bahr Moais, which branches off the Tawfiqi Rayah at km 35.00 on the right bank, approximately 580 metres downstream of the existing head regulator.<\/p>\n<p style=\"text-align:left;color:#555;font-size:16px;line-height:2.4;\">The new regulator was planned in response to the age and deteriorating structural condition of the existing regulator, originally constructed in 1888. The existing structure plays an important role in supplying freshwater to Sharqia Governorate and parts of the Canal Governorates, including Ismailia and Port Said.<\/p>\n<p style=\"text-align:left;color:#555;font-size:16px;line-height:2.4;\">The project aims to facilitate water distribution balancing, improve control over water flows, and maximise the efficient use of available water resources.<\/p>\n<\/div><\/div><\/div>[\/vc_column][vc_column width=&#8221;1\/3&#8243; css=&#8221;.mwri_bahr_moais_goal{padding:20px !important;}&#8221;]<div id=\"mwri_bahr_moais_goal_en\" class=\"mwri_bahr_moais_goal_en services clr style1 services_b\"><div class=\"service_custom\"><i class=\"fa fa-solid fa-bullseye\"><\/i><\/div><div class=\"service_text\"><h3>Main Objective<\/h3><div class=\"cz_wpe_content\"><p style=\"text-align:center;color:#555;font-size:15px;line-height:2.2;\">Improve water flow control, facilitate water distribution balancing, and maximise the efficient use of water resources.<\/p>\n<\/div><\/div><\/div>[\/vc_column][\/vc_row][vc_row full_width=&#8221;stretch_row&#8221; gap=&#8221;0px&#8221; rtl_reverse=&#8221;yes&#8221; css_animation=&#8221;none&#8221; css=&#8221;.vc_custom_1791965301235{background-color: #F5F8FA !important;}&#8221;][vc_column]<div class=\"cz_gap clr \" style=\"height: 25px\"><\/div><div id=\"cz_10629\" class=\"cz_10629 cz_title clr cz_title_pos_inline tac\"><div class=\"cz_title_content\"><div class=\"cz_wpe_content\"><h2 style=\"text-align: center; color: #173f67; font-size: 32px; font-weight: bold;\">Structural and Hydraulic Specifications<\/h2>\n<\/div><\/div><\/div><div class=\"cz_gap clr \" style=\"height: 25px\"><\/div>[vc_row_inner gap=&#8221;15px&#8221; rtl_reverse=&#8221;yes&#8221;][vc_column_inner width=&#8221;1\/3&#8243;]<div id=\"mwri_bm_gates_en\" class=\"mwri_bm_gates_en services clr style1 services_b\"><div class=\"service_custom\"><i class=\"fa fa-solid fa-water\"><\/i><\/div><div class=\"service_text\"><h3>Number of Bays<\/h3><div class=\"cz_wpe_content\"><p style=\"text-align:center;color:#555;font-size:16px;line-height:2;\">5 bays, each 5 metres wide.<\/p>\n<\/div><\/div><\/div><div class=\"cz_gap clr \" style=\"height: 25px\"><\/div>[\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;]<div id=\"mwri_bm_bridge_en\" class=\"mwri_bm_bridge_en services clr style1 services_b\"><div class=\"service_custom\"><i class=\"fa fa-solid fa-truck\"><\/i><\/div><div class=\"service_text\"><h3>Bridge Load Capacity<\/h3><div class=\"cz_wpe_content\"><p style=\"text-align:center;color:#555;font-size:16px;line-height:2;\">70 tonnes; the bridge roadway is 12 metres wide, including two sidewalks.<\/p>\n<\/div><\/div><\/div><div class=\"cz_gap clr \" style=\"height: 25px\"><\/div>[\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;]<div id=\"mwri_bm_balance_en\" class=\"mwri_bm_balance_en services clr style1 services_b\"><div class=\"service_custom\"><i class=\"fa fa-solid fa-gauge-high\"><\/i><\/div><div class=\"service_text\"><h3>Maximum Balancing Difference<\/h3><div class=\"cz_wpe_content\"><p style=\"text-align:center;color:#555;font-size:16px;line-height:2;\">2.50 metres.<\/p>\n<\/div><\/div><\/div><div class=\"cz_gap clr \" style=\"height: 25px\"><\/div>[\/vc_column_inner][\/vc_row_inner][vc_row_inner gap=&#8221;15px&#8221; rtl_reverse=&#8221;yes&#8221;][vc_column_inner width=&#8221;1\/3&#8243;]<div id=\"mwri_bm_flow_en\" class=\"mwri_bm_flow_en services clr style1 services_b\"><div class=\"service_custom\"><i class=\"fa fa-solid fa-gauge-high\"><\/i><\/div><div class=\"service_text\"><h3>Maximum Design Flow<\/h3><div class=\"cz_wpe_content\"><p style=\"text-align:center;color:#555;font-size:16px;line-height:2;\">13.750 million cubic metres per day.<\/p>\n<\/div><\/div><\/div><div class=\"cz_gap clr \" style=\"height: 25px\"><\/div>[\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;]<div id=\"mwri_bm_level_en\" class=\"mwri_bm_level_en services clr style1 services_b\"><div class=\"service_custom\"><i class=\"fa fa-solid fa-water\"><\/i><\/div><div class=\"service_text\"><h3>Maximum Water Level<\/h3><div class=\"cz_wpe_content\"><p style=\"text-align:center;color:#555;font-size:16px;line-height:2;\">12.45 metres.<\/p>\n<\/div><\/div><\/div><div class=\"cz_gap clr \" style=\"height: 25px\"><\/div>[\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;]<div id=\"mwri_bm_duration_en\" class=\"mwri_bm_duration_en services clr style1 services_b\"><div class=\"service_custom\"><i class=\"fa fa-solid fa-calendar-days\"><\/i><\/div><div class=\"service_text\"><h3>Project Duration<\/h3><div class=\"cz_wpe_content\"><p style=\"text-align:center;color:#555;font-size:16px;line-height:2;\">24 months, according to the published project information.<\/p>\n<\/div><\/div><\/div><div class=\"cz_gap clr \" style=\"height: 25px\"><\/div>[\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row][vc_row gap=&#8221;0px&#8221; rtl_reverse=&#8221;yes&#8221; css=&#8221;.mwri_bahr_moais_components{padding:65px 0 !important;background:#fff !important;}&#8221;][vc_column width=&#8221;1\/2&#8243; css=&#8221;.mwri_bahr_moais_components_text{padding:25px 35px !important;}&#8221;]<div id=\"cz_4245\" class=\"cz_4245 cz_title clr cz_title_pos_inline\"><div class=\"cz_title_content\"><div class=\"cz_wpe_content\"><h2 style=\"text-align: left; color: #173f67; font-size: 30px; font-weight: bold;\"><strong>Components of the New Regulator<\/strong><\/h2>\n<hr style=\"width: 75px; margin-left: 0; border: 0; border-top: 2px solid #CBA123;\">\n<p style=\"text-align: left; color: #555; font-size: 16px; line-height: 2.4;\"><strong>The project specifications include a concrete bridge designed for a load capacity of 70 tonnes, five bays equipped with vertical gates, and operating and control systems that support the management of water flows.<\/strong><\/p>\n<p style=\"text-align: left; color: #555; font-size: 16px; line-height: 2.4;\"><strong>Associated facilities include two water-level measurement wells, a generator building, a control building, a monitoring building, perimeter fencing and metal gates, lighting and fire protection systems, a standby power generator, and control and monitoring equipment.<\/strong><\/p>\n<\/div><\/div><\/div>[\/vc_column][vc_column width=&#8221;1\/2&#8243; css=&#8221;.mwri_bahr_moais_components_cards{padding:20px !important;}&#8221;]<div id=\"mwri_bm_control_en\" class=\"mwri_bm_control_en services clr style1 services_b\"><div class=\"service_custom\"><i class=\"fa fa-solid fa-gears\"><\/i><\/div><div class=\"service_text\"><h3>Integrated Operation and Control System<\/h3><div class=\"cz_wpe_content\"><p style=\"text-align:left;color:#555;font-size:15px;line-height:2.2;\">Metal gates, operating mechanisms, control and monitoring systems, and supporting electrical equipment.<\/p>\n<\/div><\/div><\/div><div id=\"mwri_bm_protection_en\" class=\"mwri_bm_protection_en services clr style1 services_b\"><div class=\"service_custom\"><i class=\"fa fa-solid fa-shield-halved\"><\/i><\/div><div class=\"service_text\"><h3>Protection and Rehabilitation Works<\/h3><div class=\"cz_wpe_content\"><p style=\"text-align:left;color:#555;font-size:15px;line-height:2.2;\">Bed and side-slope protection, watercourse rehabilitation, and repair and restoration works on parts of the existing regulator, as specified in the project scope.<\/p>\n<\/div><\/div><\/div>[\/vc_column][\/vc_row][vc_row full_width=&#8221;stretch_row&#8221; gap=&#8221;0px&#8221; rtl_reverse=&#8221;yes&#8221; css_animation=&#8221;none&#8221; css=&#8221;.vc_custom_1791965797234{background-color: #F5F8FA !important;}&#8221;][vc_column]<div class=\"cz_gap clr \" style=\"height: 25px\"><\/div><div id=\"cz1192\" class=\"cz1192 cz_title clr cz_title_pos_inline tac\"><div class=\"cz_title_content\"><div class=\"cz_wpe_content\"><h2 style=\"text-align:center;color:#173F67;font-size:32px;font-weight:bold;\">Project Scope of Works<\/h2>\n<p style=\"text-align:center;color:#666;font-size:16px;line-height:2;\">Integrated civil, hydraulic, mechanical, and electrical works<\/p>\n<\/div><\/div><\/div><div class=\"cz_gap clr \" style=\"height: 25px\"><\/div>[vc_row_inner gap=&#8221;15px&#8221; rtl_reverse=&#8221;yes&#8221;][vc_column_inner width=&#8221;1\/4&#8243;]<div id=\"cz_6602\" class=\"cz_6602 services clr style1 services_b\"><div class=\"service_custom\"><i class=\"fa fa-solid fa-water\"><\/i><\/div><div class=\"service_text\"><h3>Watercourse and Diversion Works<\/h3><div class=\"cz_wpe_content\"><p style=\"text-align: left; color: #555; font-size: 15px; line-height: 2.3;\"><strong>The works include dredging and widening the watercourse, stone pitching of side slopes, raising adjacent embankment levels, bed protection, constructing the diversion channel, installing sheet piles, and carrying out excavation and diversion activities.<\/strong><\/p>\n<\/div><\/div><\/div><div class=\"cz_gap clr \" style=\"height: 25px\"><\/div>[\/vc_column_inner][vc_column_inner width=&#8221;1\/4&#8243;]<div id=\"cz_1495\" class=\"cz_1495 services clr style1 services_b\"><div class=\"service_custom\"><i class=\"fa fa-solid fa-bridge\"><\/i><\/div><div class=\"service_text\"><h3>Regulator Structure Construction<\/h3><div class=\"cz_wpe_content\"><p style=\"text-align: left; color: #555; font-size: 15px; line-height: 2.3;\"><strong>These works include temporary earth cofferdams, dewatering, soil replacement, concrete works, bridge construction, installation of metal gates, and construction of auxiliary facilities and operating systems.<\/strong><\/p>\n<\/div><\/div><\/div><div class=\"cz_gap clr \" style=\"height: 25px\"><\/div>[\/vc_column_inner][vc_column_inner width=&#8221;1\/4&#8243;]<div id=\"cz_7458\" class=\"cz_7458 services clr style1 services_b\"><div class=\"service_custom\"><i class=\"fa fa-solid fa-bolt\"><\/i><\/div><div class=\"service_text\"><h3>Mechanical and Electrical Works<\/h3><div class=\"cz_wpe_content\"><p style=\"text-align: left; color: #555; font-size: 15px; line-height: 2.3;\"><strong>Supply and installation of gate operating and lifting systems, lighting, fire protection and civil defence systems, a standby generator, and control and monitoring equipment.<\/strong><\/p>\n<\/div><\/div><\/div><div class=\"cz_gap clr \" style=\"height: 25px\"><\/div>[\/vc_column_inner][vc_column_inner width=&#8221;1\/4&#8243;]<div id=\"cz_7534\" class=\"cz_7534 services clr style1 services_b\"><div class=\"service_custom\"><i class=\"fa fa-solid fa-screwdriver-wrench\"><\/i><\/div><div class=\"service_text\"><h3>Rehabilitation of the Existing Regulator<\/h3><div class=\"cz_wpe_content\"><p style=\"text-align: left; color: #555; font-size: 15px; line-height: 2.3;\"><strong>The published works include repairing and restoring stone masonry, installing steel sections, maintaining and painting gates and operating equipment, and rebuilding the rear parapet of the existing regulator.<\/strong><\/p>\n<\/div><\/div><\/div><div class=\"cz_gap clr \" style=\"height: 25px\"><\/div>[\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row][vc_row gap=&#8221;0px&#8221; rtl_reverse=&#8221;yes&#8221; css=&#8221;.mwri_bahr_moais_entities{padding:65px 0 !important;background:#fff !important;}&#8221;][vc_column]<div id=\"cz_7159\" class=\"cz_7159 cz_title clr cz_title_pos_inline tac\"><div class=\"cz_title_content\"><div class=\"cz_wpe_content\"><h2 style=\"text-align: center; color: #173f67; font-size: 32px; font-weight: bold;\">Project Implementation Entities<\/h2>\n<\/div><\/div><\/div><div class=\"cz_gap clr \" style=\"height: 25px\"><\/div>[vc_row_inner gap=&#8221;15px&#8221; rtl_reverse=&#8221;yes&#8221;][vc_column_inner width=&#8221;1\/3&#8243;]<div id=\"mwri_bm_executor_en\" class=\"mwri_bm_executor_en services clr style1 services_b\"><div class=\"service_custom\"><i class=\"fa fa-solid fa-building\"><\/i><\/div><div class=\"service_text\"><h3>Executing Entity<\/h3><div class=\"cz_wpe_content\"><p style=\"text-align:center;color:#555;font-size:15px;line-height:2.2;\">Armed Forces Engineering Authority \u2013 Military Engineers Department.<\/p>\n<\/div><\/div><\/div><div class=\"cz_gap clr \" style=\"height: 25px\"><\/div>[\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;]<div id=\"cz_6525\" class=\"cz_6525 services clr style1 services_b\"><div class=\"service_custom\"><i class=\"fa fa-solid fa-drafting-compass\"><\/i><\/div><div class=\"service_text\"><h3>Consultant<\/h3><div class=\"cz_wpe_content\"><p style=\"text-align: center; color: #555; font-size: 15px; line-height: 2.2;\">Engineering Consulting Bureau<br \/>\n (ECB).<\/p>\n<\/div><\/div><\/div><div class=\"cz_gap clr \" style=\"height: 25px\"><\/div>[\/vc_column_inner][vc_column_inner width=&#8221;1\/3&#8243;]<div id=\"mwri_bm_contractor_en\" class=\"mwri_bm_contractor_en services clr style1 services_b\"><div class=\"service_custom\"><i class=\"fa fa-solid fa-helmet-safety\"><\/i><\/div><div class=\"service_text\"><h3>Contractor<\/h3><div class=\"cz_wpe_content\"><p style=\"text-align:center;color:#555;font-size:15px;line-height:2.2;\">The Arab Contractors \u2013 Tunnels and Sliding Formwork Department.<\/p>\n<\/div><\/div><\/div><div class=\"cz_gap clr \" style=\"height: 25px\"><\/div>[\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row][vc_row full_width=&#8221;stretch_row&#8221; gap=&#8221;0px&#8221; rtl_reverse=&#8221;yes&#8221; css=&#8221;.mwri_bahr_moais_footer{padding:50px 20px !important;background:#173F67 !important;}&#8221;][vc_column]<div id=\"cz_1824\" class=\"cz_1824 cz_title clr cz_title_pos_inline tac\"><div class=\"cz_title_content\"><div class=\"cz_wpe_content\"><h2 style=\"text-align: center; color: #ffffff; font-size: 30px; font-weight: bold; line-height: 1.8;\"><strong>Developing Water Infrastructure for More Efficient Water Management<\/strong><\/h2>\n<p style=\"text-align: center; color: #ffffff; font-size: 16px; line-height: 2.3;\"><strong>The New Bahr Moais Head Regulator Project is part of water infrastructure development efforts to improve flow control, strengthen water management, and support the efficient use of available water resources.<\/strong><\/p>\n<\/div><\/div><\/div>[\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_column &#8230; <a class=\"cz_readmore\" href=\"https:\/\/www.mwri.gov.eg\/mwri2\/?portfolio=new-bahr-moais-head-regulator-project&#038;lang=en\"><i class=\"fa fa-angle-right\" aria-hidden=\"true\"><\/i><span>Read More<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":36626,"comment_status":"open","ping_status":"closed","template":"","format":"standard","meta":[],"portfolio_cat":[178],"portfolio_tags":[],"class_list":["post-36628","portfolio","type-portfolio","status-publish","format-standard","has-post-thumbnail","hentry","portfolio_cat-projects"],"_links":{"self":[{"href":"https:\/\/www.mwri.gov.eg\/mwri2\/index.php?rest_route=\/wp\/v2\/portfolio\/36628","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mwri.gov.eg\/mwri2\/index.php?rest_route=\/wp\/v2\/portfolio"}],"about":[{"href":"https:\/\/www.mwri.gov.eg\/mwri2\/index.php?rest_route=\/wp\/v2\/types\/portfolio"}],"author":[{"embeddable":true,"href":"https:\/\/www.mwri.gov.eg\/mwri2\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mwri.gov.eg\/mwri2\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=36628"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mwri.gov.eg\/mwri2\/index.php?rest_route=\/wp\/v2\/media\/36626"}],"wp:attachment":[{"href":"https:\/\/www.mwri.gov.eg\/mwri2\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=36628"}],"wp:term":[{"taxonomy":"portfolio_cat","embeddable":true,"href":"https:\/\/www.mwri.gov.eg\/mwri2\/index.php?rest_route=%2Fwp%2Fv2%2Fportfolio_cat&post=36628"},{"taxonomy":"portfolio_tags","embeddable":true,"href":"https:\/\/www.mwri.gov.eg\/mwri2\/index.php?rest_route=%2Fwp%2Fv2%2Fportfolio_tags&post=36628"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}